
Meghna Crossing
Cable-stayed bridge · 2025
Structural engineering and main contracting. Bridges, frames, plant and deep basements — the parts of a project nobody photographs and everything rests on.

Cable-stayed bridge · 2025

Structural steel frame · 2024

Industrial build · 2024

Metro infrastructure · 2023

Deep excavation · 2023

Site delivery · 2022
Engineering & construction, Dhaka · Tejgaon, Dhaka
Bhitti was founded in 2003 as a two-man structural consultancy and now employs four hundred and ten people across design and construction. We hold our own plant and our own testing lab, which is why our concrete results arrive in two days rather than two weeks.
We say no to about a third of what we are asked to price. A tender we cannot build to programme is a tender that costs everybody money, and we would rather lose it at the start than in month nine.
RCC and steel, from the soil report to the bar bending schedule. Every set checked by a second engineer who did not draw it.
We build what we design, or what somebody else designed if the drawings stand up. Fixed price, named programme.
Excavation, shoring and piling on tight city plots with neighbours on three sides. Monitoring from day one.
Our own lab. Cube tests, rebar scanning and load testing, for our projects and for other people's.
They turned down our tender and told us why. We fixed the programme, re-tendered, and they built it on the date they said.
Developer, TejgaonTheir lab found a bad batch on a Thursday. On our last project we would have found it in the crack survey two years later.
Project Director, metro package